Every project represents our commitment to quality —
witness the results we create together with our clients.

Twenty-four days on board: old sections out, new ones welded in, welds passivated and the run insulated and clad — with port and starboard overlapping

Thirteen days from order to acceptance, with a single day on board — because it had already been assembled and tested in the workshop

A portal-frame steel platform for equipment that is lifted and lowered in use — fabricated ashore, assembled on board in two separate visits, and accepted by the owner's representative

Ventilation components fabricated, assembled and finished in the workshop, then held ready — so that only positioning and welding remained to be done on board