Drainage Pipe Modification & Scaffolding

Drainage pipework in a compartment usually runs high up along the deckhead and bulkheads, out of reach from floor level, so a working platform has to go up first. Cutting and removing the existing pipework generates heat and sparks, which makes working-at-height safety and the protection of surrounding equipment as important as the pipework itself.

The scope of work covers erection and removal of the working scaffolding, cutting and removal of existing pipework, and fabrication and welding of the new runs. The scaffolding uses mobile frames with platforms and guardrails, built up in tiers to suit the compartment height. Pipe sizes, routing, and fall are designed around drainage requirements and the existing structure.

Drainage Pipe Modification & Scaffolding 1

Key Features

  • • Mobile scaffold frames built up in tiers to suit compartment height, with platforms and guardrails
  • • Cutting carried out from the scaffold platform, with surrounding equipment protected beforehand
  • • New pipework welded into the existing run, keeping the original routing and fall

Applications

  • • Altering and extending existing drainage pipework in compartments
  • • Inspection and replacement of pipework at height
  • • Erecting working platforms for work inside compartments